| Show Track Tra k Is Completed ted tedI it I Ogden Nov No 26 The Southern Pacific 1 force tonight completed Its track to the west side of ot the prom promontory promontory promontory The grading of the track across the has for tor several days been completed by the contractors Core ros Alden with the tion of a few culverts and the laying of the track was completed tonight This will greatly facilitate the convey conveyance ance of supplies to the west arm of the lake which Is already being bridged The piles plIes have to be driven driver to great depth dl on a portion of this stretch of the work Soft mud Is Js found as on the east side and the greater depth of the water makes m k s the longer longcr piling necessary sary M I |