Show YANKEE CON AFFAIRS Plan Pla of K Retrenchment iter fter Settling i With May Kay Day DayA A After issuing a check for to the theMay theMay theMay May Day Dy company comp ny the directors director of the theY Yankee Consolidated at once buckled down to busine business and made arrange arrangements arrangements t ments to cut Ute expense account down downto i to the minimum until such su h time as IUS the theore theor theore ore or chute developed on n aa the May Day side of at the line is opened up in m undisputed undisputed territory on D fl the Yankee side Speaking of the matter yesterday a director of the company said the 3 t to the May Day did not leave 4 the company bro broke e by any an means and andle he be le was 88 more than confident the theore theore ore chute Mute would be opened in their own ground without t having to resort re ort to as 8 assessments assessmentS Manager Egan he said aid d had proffered his services s free until such time thoe as the mine was again mak sink making maKing I ing jag money and his hias offer had been ac accepted d The foremans salary had been reduced and the working force at the mine cut down to the necessary three thrifts which had bad been put on to run the sixty sL ty feet necessary to cut the chute from another point in the tunnel In twenty days at the outside the theS S gentleman said the Yankee would again be sending out ore and with nealI iy COO feet fe of toping sloping ground above the tunnel UmBel level he had bad no doubt that S dividend money would be forthcoming I in the near r future |