Show PROGRESS BEING MADE North Beach San Francisco Will Soon Be Rebuilt San Francisco Aug 12 Active build bund building bundIng building ing operations are going forward in the manufacturing and residence districts along the north beach from the top of Telegraph hill to Vanness avenue and from Vallejo street to the bay From present indications the north beach will willbe willbe willbe be the first to boast of complete reha rehabilitation rehabilitation rehabilitation The gas gaa plant and other manufacturing plants are rebuilding and several are running on a larger scale than before New factories have been established Five Fhe new and three old lumber companies have yards ards near the docks Piles Plies are be being beIng belog ing log driven for feet of new wharves and some of the largest warehouses in inthe inthe inthe the city are being built along the sea seawall seawall wall The British steamer Visigoth arrived today from Southampton with a a large amount of cement and structural mate material material material rial An exceptionally large quantity of lum lumber lumber lumber ber came Into port today from coastwise points north and south Up to sundown over feet of lumber besides a shipload of building plies piles was received |