Show NEW WATER SUPPLY DUch filch From Prom New Canyon to lo Intake of Power Canal In tat I Completed Special to The Ephraim Nov 7 Work on the ditch which carries water from front the tha nun canyon canon to the intake of the pow power er canal was wu finished during the pw past few tew days da and the water is now flow flowIng flowIng Ing lag through h the turbine at the power plant This new acquisition almost doubles the volume of water available for the electric light plant plant and assures more than enough electric power for tor toral all al purposes The new ditch dich was wa constructed at a 9 I comparatively small cast Ot As A nearly as a can be foretold at present present there Is only one thing that could Interfere with wih the electric service this winter and that is the freezing over oer of the canal te |