Show FIRST CAMP ESTABLISHED Preliminary Construction Work on or I Strawberry Valley Project Is Started District Engineer George L Swend sen established his first construction 1 camp at Thistle last lat Saturday in con connection connection connection with wih the Strawberry valley aley ir irrigation project Thirty men and twelve teams are now at work grading a spur spui 1 just beyond Thistle for the Rio Grande Grand Western Vestern railroad The machinery machiner sup supplies plies ples and equipment for the project will wil willbe wi I be shipped out on this spur half a mile mUe I in length and from there freighted into int the valley by teams Some grading graing has already been done dom domon I on the road up Spanish Fork canyon to tc Diamond Fork The reclamation ser sen service serice vice ice will wil build a road up Diamond Fork Fort C to the dam site sie This work will wi take tak considerable time and it i is said that tha thaS before it is i completed a camp will wi be b S established in Strawberry valley valey to t commence preliminary work there A storehouse and other buildings are arc to tobe tobe t I be constructed at Thistle in the near nea r future It I is possible that next week wed Mr will wi be authorized to ad advertise advertise I vertise for bids for the power plant The contract for the building of the th I telephone system into the valley has not no t been awarded but Mr lr is i S Washington looking every day for a notice from fron a |