Show WORK APPROACHING END Harriman Haniman Improvements Are Assum Assuming Assuming ing Shape Freight Tracks Now Laid The Oregon Short Line and the Salt Lake Route tracks which have been laid through h the block bounded by Third and tind Fourth West and Second and First South streets have havo been Joined to the main tracks running along Third West est street These switches will wilt permit trains passing within a few feet teet of oC either side of ot the new freight depot and the loading and unloading platforms Freight trains can reach the depot and freight yard plat platforms platforms platforms forms from the south or north ends go going goIng going ing to them directly from the main tracks The platforms on one side elde will be used to unload freight from the trains into the depot or vans while the opposite plat pint platforms platforms forms will be used to hold freight con consigned consigned consigned signed to outside points While White the ar arrangement arrangement of these switches is simple it will eliminate a great deal of switching and reduce the work of handling freight to a 8 minimum The yards ards and new depot will provide room for hundreds of tons tone of oC freight Umbrella sheds on the west of the freight depot will offer storage room for overflow freight Harriman improvements are now as assuming assuming assuming suming shape The the long yards are leveled from the north end to Second South street The freight depot Is enclosed Flooring is being laid and the at atthe atthe atthe the south end of ot the structure are being finished When hen they are ready for oc tho the yard and freight officials offices will wm be removed from present pres nt quarters scattered about the yards The viaduct across the tracks on North Tem Tew Temple pIe street is completed as far as frame framework framework framework work Is concerned The flooring will be laid within a month or so 50 Ample room has been provided for Cor pedestrians teams and if needed for car tracks All work wilt will ill be completed by spring when ground will be broken for the new dollar depot to be erected at the foot of oC South Temple street |