Show UTAH COPPER Mill Mi Handled Over Tons of Ore Orea a Day For April Apri During the thc month of April Apri the Utah I Copper company put through its is big mi mill at Bingham an average of ot bet beter I tel t ter er than tons of ore per day and turned out a larger and better class i of concentrates than the mill mi has ha ever i before made made At the present moment ten carloads are at the sampler and three were being settled for yester i day d I IThe The TIre recently installed Hartz jigs have been performing very nicely and an the management Is not at all aU sorry that they were installed They take care of about 85 83 per cent of the ore handled the Wilfley tables and ad Frue being depended upon for the finishing processes As soon son as convenient it is under understood understood stood st od Manager D C Jackling will wi make an investigation of the perform performances performances performances ances of the Hancock jigs and If he considers them to be what is needed it is very vcr likely y that the present plant will be equipped with wih one or more of them thus greatly adding to the capacity S During the week several rooms ad adjoining adjoIning adjoining joining the compans regular office i apartments in the McCornick block have been secured and fitted up for forthe forthe i ithe the engineering force th t at t is to be em employed ein employed upon the new works railroad etc Field work has been in itt progress for some settle little time and it will wi not be long till ti plans have been prepared and matters mater shaped up for securing suring bids on material and equip equipment equipment ment and construction work The Tire proposition is of such magni magnitude magnitude magnitude tude that time is required to out the tile details but Manager lanager Jackling is ia crowding everything eVel thing to the limit in preparation for the day when work can be Inaugurated |