Show O ot DALY If the Mine Is Opened Assessments Are in Sight With respect re to the possibility of re resumption at the Dab Daly mine President Chambers said yesterday that If any anything anything thing was done either No o 1 or No 2 shaft would most mort likely be sent down downto to the draIn tunnel level The former is Ic now down 1000 feet and the latter 1300 1100 To connect with the No o 1 shaft the tunnel will have to bs be extended be between tween OO and feet while to Jet get under the latter several sever l hundred feet of a will wll nave have to be driven some some plan ot of n will shortly be dc Mr lr Chambers ad admits mite mits but j just what It will be behe he Is not yet prepared to say though the plan pan of sinking to connect with the drain tunnel Is considered to be the but best wa of putting the mine In shape for systematic work No o definite action cUon Is looked for pre prelow low to the adjourned meeting of to be held on the but should the plan be adopted It means something like 1000 feet teet of and be exploration on of the vein on the lower 1 and several assessments would ouId have to be levied be before before fore the mine could be again pieced on ona a paying basis |