Show Starting Up of the Smelter On Thursday morning the stack at the Park City Smelter was fired and from the very start to the present writing there has not been 1 hitch or jar in the work Everything wad ready there was not a screw to tighten or n blow left to be given after the start Every EO often a charge of ore and the exact amount of limestone and iron for fluxing is put in and as regularly tho slag is tapped and a bar of bullion is turned out All this gone on night and day every man fits in his place a1 though he had been at work for year The iron is pronounced by PiofeE sor New berry to be of the mme character char-acter as that found in Iron County where deposits sufficient supply the world are found I work up to about 65 per cent iron and the limestone lime-stone to about 55 per cent lime everything bearing out the chemical results obtained beforehand by Mr Terhune The first ore emelted was Woodside and Sunnyside The water tank is perfectly tight and holds fourteen tons of water a reserve re-serve supply for hal a day in case the pump should break Pipe conneo lions with the waterworks are being made when an inexhaustible supply sup-ply will be always at commend com-mend Tbe Corniih roll In which the foreman William Terhune received injuries some time ago have been GO protected with a goodsized hopper ot boiler iron and shoals for the gear wheels that no one can easily get injured again Beside it prevents tools from getting into the roll Tho bullion output ia i very satisfactory Park City Record |