Show TINTIC SMELTER SWELTER RUNNING AT FULL TILT AGAIN The Eureka Reporter explains that the Tintic Smelting plant has ex cx experienced but bat little trouble through the damaging of a pump us used d to lift the wa water water ter tel heated mated in the water jackets of or the blast i furnaces to the cooling rat Tat It was not the station pump at the Swansea mine that I was damaged and the one knocked out at the smelter simply retarded retard d operations ns In one of the furnaces for a few hours The other furnace c was kept in operation without difficulty difficult The sas fur further ther The smelter Is turning out the usual amount of bullion and Superintendent Viv Vivian VivIan 1 ian stated today tOO that the third furnace would be handling its share of ore tomor tomorrow tomorrow row ro Saturday The fourth furnace f which will be for the treatment of copper ore will also be ready to go Into com corn commission commission mission within a very Yer short time There has been some little delay dela In the arrival of a shipment of structural steel ste 1 and this has held the construction work back some somewhat somewhat what The Tintic smelting plant commenced taking power from the Telluride Power company this week and the entire plant Is running as smoothly as though it had been In commission for tor years ears Within a week or two the smelter will no doubt be accepting ore from all an of or th the mines which have contracts with the new plant |