Show CEDAR TALISMAN TO START SHIPPING ORE Teams have been engaged to start Thursday hauling ore from the Cedar Talisman mine to Milford for shipment to the smelter seler The Te new body bod of ad ore encountered in inthe inte Inthe the te level of the Talisman sec section section tion ton has bas widened to three tree feet feet Man Manager Manager Manager ager Pond says while the shoot on the level Jevel is maintaining its it width of ot about ten feet feet The ore from both places Is said sid to average 40 0 a a ton In value as it is broken down shipments shipment could be easily sorted to run rn 00 a aton aton aton ton but It is I regarded the part par of economy to take to market everything between the te walls wals |