Show Drain 1 Tunnel Shaft Shat t Making aking Good Progress The Ruby shaft of ot the Knight Drain Tunnel company is reported to tobe tobe tobe be nearIng the level ol with c conditions condi condi- I J lOlls Quite nuite favorable for sinkIng sink sink- Ing Tho The work Is being handled under contract and while the first few tev hundred hun hun- dred fe feet t. t was vcr very expensive owing to tho the surface water encountered thin things 9 aro are now lOW moving along more mere smoothly and good footage Is being mails mado without the tho exp expenditure of ot nn any large sum of mo mon y Eureka Reporter I I |