Show P PATSY A ISY MARLEY I TO USE TRAM Utah Michigan Will Wil 1 Connect New Nev Ore Body From Front Tunnel Work ork I Supt R. R R. R Van an of or the Utah Michigan Utah was down from froni Alta yesterday reporting reporting- to Manager N. N W. W Haire More 1010 ore has just been heen sent down from the Patsy Marley Manley Ie Ia-Ie Mr Ir Van Yan reports good Yal gOOI Sleighing lel he between tween Tanners lanners Flat Fat and Wasatch There are arc usually two ruther ruther ru- ru ther then bal bad places In tho the road where the suns sun's rays cut out the snow owing to the favoring fa topography When hon tho tunnel reaches tho the Marley ore body at o additional depth leNh tho the ore can ho bo ft sloped and conveniently run out ut to to the tho tramway which is on only about 1000 feet distance The tunnel work has about 12 feet to go to its objective This may require five or six weeks 1 Sonic Some eight carloads of or this better gra grade o of oro ore have ha he been en shipped and the netted the company close to There is now no 10 influenza troubling the time camp It I has hus been hicen eradicated from camp since about abo t November 1 1 |