Show Ute Ute Oil Prepares ares to toS Erect Shale Plant S It I Is stated that tho ho Utah Oil 01 compan company com corn actual construction construe construe- pan pany will wIl commence loin tion ton work by September 25 on a proPOSed proposed proposed pro pro- posed ton OO-ton shale oil shale oi-shale distilling plant In the Watson Vatson section of or Utah It is u 1 1 1 n I saiu salu mat tucy ncy U Id un tid u mo IJ 1 c for tine tho plant accumulated at tho the site Inclusive of oC retorts structural steel brick ick ant and tanks Tho The Wallace process Is to bo used It I Is said that the tho Russell Rus nus- soil sell Engineering company has contracted contracted con con- for the erection of or the tho plant and will wi send men to Watson In a few Cow ow c days a ys |