Show IMPROVEMENT i IN ALTA CON Since Power Po Came CaIne on on Both I and Raise Are Looking Better wor word from Manager Inn ger Lewis Lev of ot the Alta Alia Con Consolidated Is that one carload carloa carload car car- loa load of ore has left leCt and teams will wiil be at nt the time mine Monday or Tuesday to start loading loading- a second TIme The ore sampling shows how it to be of or good grade I It came from Crom several faces some from I I the new lower workings out from tho the Copper Prince tunnel some orne from tho the I Brooklyn workings and amid some flome from the he I I new nW work to the tho cast enst of there I Mr MiS 11 Lewis writes that hint both bolh the I Ion on tho the fissure and amid the I Ithe I In the time Silver Sliver King Icing fissure are steadily I Improving now no that hat power powel Is on on and I good pro progress ma may bo be made once more I Tho The raise off the tho Drain also i I Is looking fine he lie writes s. s This Is Isa surely a mine h he says pays as v |