Show GREENHOUSE FOR SCHOOL Deaf Deat find Students Student to lo D De Be Gh Given n nf nork f Work ork rk In Horticulture Special to The Herald Ogden Aug 6 G. greenhouse be- be ing erected at the state school for tor the tho deaf deat and blind will he be completed in three weeks and will be one of ot the tile most modern in the state It will cost ost 1500 Is feet teet and divided into three thrpo separate rooms that may be temperatures i Superintendent 1 F. F L M. M Drigge says horticulture will vill be taught to deaf deat atu- atu dents lent Full third one-third of ot the boys hoys go to farming after graduating from that ins Institution t I tu t to n. n |