Show WORK SLATED OCT I 1 ON MOULDER BOULDER RAILWAY los angeles aug 7 work on the union pacific branch una ino of 22 nailes miles to serve doulder boulder dani dam irrigation and hydroelectric project will begin approximately october 1 it was estimated today when bids were called for grading and construction of bridges tind cu lverts along tho the line nineteen contractors in los ange angeles lea ogden salt lake denver san pran iran cisco and omalia omaha were naked to submit prop osela tor for the work by sapt it 16 the proposed pro call for grading from a point miles south ot of las vegas nov nev approximately 22 miles cast and southeast to a point designated summit which la is miles froni roni tile tho damatta da malte matte from summit to the ainslie and the main construction center the government will build and operate its own rail railroad roal bids asked are to include the con st barnt ruction alon ot of 42 trestles and cu lverts in addition to the grading for tho th 22 2 mile standard line materials for the brags and cu lverts will be ba furnished by tho the union system and will be ba available 4 flable when needed by the con coni i tractor bids also include grading tor for live miles ot of secondary and side tracks and for or a switching track at summit which will bo be jointly used by the government th the q branch line Is to meet the union pacific main cililo line be between 11 bracken and pierce nevada two st stations south 0 of las ize vegas tho the junction of tho the main line is mile from los angeles and nilles miles from lna LAs vegas present government estimates place furnishing rall rail facilities 1 I 1 tit of do boulder it der flain dam I 1 I 1 |