Show on work completed mple td on new u fam aa fc u jac vs sw 44 S baxis E i g school leh building BuBB H ding iw 7 all fil construction work in the new green river school building budding is corn com As soon as minor adjustments are made and the cleaning and pol bishing of floors and windows are accomplished the building will be shown to the board of education for their approval and acceptance there are indications ahat hat this could take place some tune time during the coming week the building will not be occupied by students for class work until it is accepted form ally by the emery county board of education As this paper went to press work ers were finishing the partitioning in the principals office placing switches on the electrical wiring and putting final applications of seal coats on file the gymnasium floor yet to be put in place are the curtains and cyclorama on the stage the permanent lunch room tables have not been installed since the supplier I 1 is bound and is behind sch sched ed ule on delivery due dv to be installed soon are also science tables and library shelving as well as additional equipment in the hot lunch kitchen kitchen cup boards stoves and refrigerators will be moved from the home EC department of the old school into the new room these things of course are the responsibility of the district and not that of the contract or when the building is deemed as complete by the contractor he will invite a formal inspection by the school board the board at that time will accept the building accord ing to the contractual specifications or win will require father futher work from the contractor to bring the building up to specifications only when the board considers all items as satis factory will the budding building be accepted tor use air 41 4 V 4 A 1 pictured above is the new GOO 09 00 green rivet rive high school which has now been completed the building has 35 square feet of ef floor space and will contain 13 classrooms in addition to ahe gym gyrn and shop however the school will not be used un til it has been inspected and approved by the coun ty board of education |