Show city authorizes purchase of water pipe for main line lie A special meeting of the roosevelt city council was held monday for the purpose of authorizing the purchase of feet of six inch water pipe and necessary fittings to replace the main line running from the labrum adams garage corner across the street north and then east to the dry gulch bridge with the installation of this pipe the water main will be made permanent and the road work now under way at the intersection can be completed the pipe is expected to arrive in roosevelt friday or saturday and will be installed the first of next week the trench is nearly ready now and it will take only about two days to lay the pipe |