Show first stage of hospital building nears completion brick work to be finished ted this week steel window frames arrhe the first stage work on the Rome roosevelt veit hospital I 1 building will be finished about september 5 it was announced today by and contractors the brick work which has been going ahead at a rapid pace will be finished some time this week all inside blocks are up and cast stone facing tho the two entrances on the south and east sides of the building have been set in place steel frames for the windows have arrived and will be installed next week it was reported first stage work consists of 0 a ail 1 concrete work including steps brick voik all bearing partitions roof supports and the roof the second stage of the work will include lath and plaster flooring plumbing electrical work and general genelar gener ar inside finishing it is hoped that the second part of the building program can go right on so that the building can be completely finished before cold weather sets in |