Show work on basin I 1 secondary roa roads ds goes forward road to 0 o ouray to be realigned by way of randlett avalon and leota junction douglas larsen district engi n neer er for the utah state road commission sion who was in roosevelt on monday and tuesday reported that work on secondary roads road throughout Du duchesne chesno and uintah counties is going forward and al ai 1 ready enrollees of the bridgeland camp have begun construction on tile the widening of the lake fork dugway this dugway at ai the present time is ten feet wide and when corn completed picked will be thiet feet in width when the widening is completed the utah state i commission will gravel it construction is also underway on the vernal manila highway anc the state road commission wil grade and gravel a four mile stretch of the highway beginning be annin at the mouth of steinacker dran north to brush creek in ill addition the commission plans the realignment an improvement of the ouray highway the old 0 id road following the tha duchesne Du chejne river nver will be abandoned and a new road laid out which will run to randlett then east cast to avalon then south past the leota junction to ouray the new alignment mi ali larsen said will increase the distance to ouray by five miles but it will be a much bertai all weather road |