Show school board makes final settlement with building contractors final settlement was made with the e contracting firms of aalboe and aalboe of provo builders of the new high school at duchesne Duch osne the now new elementary school building at myton and the new gymnasium at the roosevelt elementary school at a meeting of the duchesne county school board on friday at duchesne cliff aalboe of provo representing the firm was present at the meeting mr air aalboe was also here in the interest of checking on a few needed finishing touches on the three buildings the board decided to proceed with the project of tearing down the old duchesne school building in the immediate future to make way for the now shop imil building ding that will be started with n the next two months A delegation from lower tabi tab ona was present at fridays meeting requesting that transportation be furnished to twenty or twenty ive students into the tabiona fabiona chool next year the distance raveled graveled rave led would be about five or ix miles noon lunch was served to the board by the home economics department of the duchesne high school |