Show cemetery water system Is nearing completion the work of making a reservoir on the bench abo above the cemetery has about been completed and is now ready for the pipe six inch iron pipe has ha s been ordered for or the line from the intake down to the cemetery property which pipe should arrive very soon so that the lines to the various lots may be juit in in time for work to be completed before decoration day the committee in charge of this work are planning on a sprinkling system to be installed with the help heip ot of the lot owners they have found that the expenses will not permit of anything beyond the installation of the main pipe lines but cooperation with the committee it Is felt that a large part of ground may be covered with the sprinkler abstein so BO that lawns may be started this season |