Show AERIAL VIEW OF PROPOSED PROJECT This Is an aerial looking of the proposed Starvation on the Strawberry approximately two miles of Duchesne Tito crest of the proposed Dam is indicated by the drawn This Aerial statistical data given on Starvation part of Central Utah The first segment of the pro- Central Utah will be the Reservoir located on it Strawberry about I ind one-half miles west of Just when W construction will begin is 1 but is possible b in ACCORDING TO Information coming from the Provo and Salt Lake offices of the Bureau of Reclamation the final reports are ready for presentation to the Congress' as soon as it reconvenes early in After the report is the next step will be for a construction appropriation by Con- dam construction project Is earmarked as the first feature for construction In the Bonneville Unit of the giant Central Utah Water Conservancy It Ls hoped that this project will get under way of Reclamation gress and approved by the This is expected early in Total cost of the three phases of the Duchesne segment is The estimated breakdown is as for Starvation for the Knight diversion Dam and for the Starvation Feeder STATISTICAL data for the dam was supplied by Parley chief engineer for the Central Utah project of the Provo The Aerial photo above was provided by Herbert E. special services U. S. Department of Salt Lake City bureau Following is the statistical data supplied by Starvation Dam Height above lowest foundation Height above streambed Crest length Volume of dam cubic Top width 30 Bottom width Active capacity Inactive capacity Total capacity Surcharge capacity Water surface area Spillway capacity Outlet works capacity Approximate cost Knight Diversion Dam Height above Crest length Top width 20 Bottom width Volume of dam cubic Spillway capacity Outlet works capacity Approximate cost Starvation Feeder Canal Length Pipeline Tunnel Size Pipeline diameter P. C. Tunnel diameter Horseshoe Capacity cost |