Show Land appraisals for Starvation Dam to be made Appraisals for lands and land rights for Starvation Dam and Reservoir were on 1 by appraisers from the Salt Lake City Region 4 office of the Bureau of Dam will be the first feature of the Bonneville Unit of the Central Utah Project to be Regional Director F. M. Region Bureau of pointed appraisers will headquarter at from time to while appraisal work la underway during the next nine work will go ahead as rapidly as actual acquisition of lands and land rights cannot be undertaken until construction funds arc available and a repayment contract and other agreements are Clinton Each landowner will be Invited to accompany the appraiser during the appraisal studies of his land to assure that all matters affect ing are given ana careful each landowner will be given a which and explains the Bureau of Reclamation appraisal and acquisition procedures Starvation Dam will be constructed on the Strawberry River about 3 miles upstream from Duchesne 34 miles downstream from the planned enlargement of Strawberry according to Palmer B. Project Manager for Reclamation's Central Utah Projects The Starvation Reservoir will receive most of Its water from the Duchesne River through the Knight Feeder Canal which will be specially constructed to carry the water to the reservoir from a point on the Duchesne River above the town of Duchesne Inflows to the Strawberry River below Strawberry Reservoir will also be Water stored In Starvation Reservoir will be used to as-suro an adequate water supply for acres of presently Irrigated lands in the Duchesne River area and also to permit collection and diversion o into the Bonneville Basin without interfering with existing water |