Show Road project is started 6 The mile road construction from Bridgeland northerly on Utah Highway 86 through Is about 25 per cent reports E. J. resident engineer at Duchesne for the Utah State Road Germer-Abbott and Tremonton have working days under the to complete the project which was started The new alignment of wide road requires but a steel-reinforced concrete box for the crossing of the feeder canal to Lake This section of road joins Utah Highway 87 near Upalco with major items of work including grading and surfacing with a 2 inch road Work is expected to be suspended on the project during the coldest weather this Wilson |