| Show BRIDGE olan TO am ALL TRAFFIC TK AlTIC the new green river bridge located at green river city emery county utah lias has been opened to all traffic including heuy heavy trucks the bridge Is I 1 s GOO feet long built of reinforce 1 concrete and steel resting lasting on oil ai sav eral concrete concieta con cieto pleis piers work on the now bridge started 20 months ago when lun overloaded trucks collapsed the lie old bridge although hampered at times by cold weather and high water itoi the work pro gres m without any serious delays and only minor ingnor accidents t s |