Show city finishes job left by contractors the city marshal had a crew of men busy the ithe first of the week tilling filling in the places under the oiled road on main alain street where the water pipes go under it when the con tractors tor for the new water system dug under these places last summer they till fill them back up properly saturday the street bavei in at the alvin benson corner and the city was compelled to if fix it si 3 it was vas decided that all hese crossings better be ino before thy caved in because it if accidents should happen the city would be liable for any pampa amuses m the crossings were dun dug n the oll oil ala ab alk lye dirt packed back in firmly when it has had time to settle they will be patched again with oil the crossings involved are the ones between wm win 11 II clymans and vern morten sens the one at the paxton hotel corner the court house corner and between evan rollins corner and tho the old home besides the one first mentioned the marshal reports that it took eleven yards of material to till fill in these holes boles |