Show both roads open to yankee reservoir the roads up first and second left hand canyons in parowan carowan cannon on are now open and passable as far as the yankee reservoir the 1 first lefthand left hand road is rough and a little muddy in places but it is possible to drive a car onto the dam at pie sent snow in that fork of the canyon is is gone with the exception of a few small banks in the timber the second lefthand left hand road has been open as far as the second bridge at the foot of the hendrickson lake trail for two or inree weeks but several banks of snow above stopped travel up any higher the forest service sent an auto patrol grader up that canyon monday to move snow and open the load supposedly to the top of the ledge the road was opened and cleared of snow that far an anal vie grader made a trip down to the yankee from the forks of the road to clear fallen timber and snow banks from that road the roada road a bove the bridge is plenty wet but with the work done on the drains monday it is expected that the road will be dry by the end of the week with quite a bit of the runoff still not in the reservoir the water in the yankee lacks only about avi or 4 feet of coming over the overflow on the east side of the dam A measuring board placed just above the wood culvert in the lower end of the pond where pole creek enters shows the water standing at 51 or about 20 inches over the top of the culvert several large fish were seen in the creek at the lower end but none above the falls in the creek that enters from the south end many small fish aish were in evidence though in comparison wita ditl last year we doubt that there are as as many fish in the reservoir by one fourth though this is just a guess from a comparison of the two years before the main canyon road is also open up as far as bear flat |