Show road work to begin afir afur der deer season hancy to be spent on carowan Y creek and C dar moiena roads brinning Bg inning i ng abacut nov 1 1 I 1 boad work lit in olio ill county aih c than that now lit in K ly by the forest ice ri wll la 11 be at a standstill until abour nov I 1 ac t arding 0 o dit triet en ell meer awill vm osborn who was in town this morning the reason tor for th s Is 1 that so many ot of the men in the locality want to go leer deer hunting that commissioners ners in both beaver and iron counties have advised delaying ne new projects until the huning season is eve A further reason tor for the delay particularly lit in connection with tile cedar city nevada line road on which Is to be expended expanded Is that preliminary surveys must bo be made requiring wine time an engineer from the bureau ot or public roads and a representative of the state road io ad niort first TO a over the road mr osborn sa say then an ail en engineer gincer will be bent onto the project to tai survey lt and tho the aik nork oik will tollow follow the surveyor five thousand thon sand dollars recently allocated by the road commission from the gasoline tax fund to th s county will be divil ned between tile tho parowan Ia rowan Y and the little crek toads roads mr osborn says say this dafo n navies been beca iy ay him and the ithe county commissioners what proportion pro prop porton of the ui I 1 lint will be expended on im the respective he didat ind icat the work on oil the Y road will bo be in the hatun lot ot capping a section which completed last year incidentally it was learned rom mr osborn thai a chanec Is being roade made in tho the patrolman forthe tor tha littie cek vcr bear I 1 valley alley road carios caries thornton will replace stanley pro abero about the first of 0 the wee |