Show Pine valley boys patting over much work Wor the boys of camp F 17 at pine I 1 if le I 1 Vi Alley utah comprised comp rOsed ot men from iron salt lake and davs davis counties in fit utah nud and twenty one virginia boys have lul fill oer an all extensive work program in III their three mouths months ot of service bervice the camp site hits has been transformed I 1 from a sage brush desert to I 1 A veri veritable tabe beauty with lawns trees natural flowers and shrubs Ehri ibs rock gai gaikens dens and gravel surfaced streets the camp began in n may 2 1933 with the arrival of the virginia group which was augmented gradually with local loca I men until june jun when the personnel numbered men an additional hund dred men was added to the original one hundred on oil july 15 1933 actual work began on may 1933 when two crews went into action building roads and fences building construction was began on june octh since that time tile the following projects have been completed or are nearing completion ion fifteen ft een miles of at 16 toot foot turnpike road including four 15 toot foot bridges one 20 foot bridge three cattle guards and lineal feet ot of corrugated iron calv cu lverts erts ranging 1 in size front from I 1 12 Z inches to 42 incites inches fr in diameter four miles tot lof mountain wood road fifteen miles of 0 4 wire barbel barbed wire fence one halt mile ot of telephone una line two complete water works systems serving the camp ranger station buildings and P pine valley recreation park totaling feet ot of pipe line A group of three buildings at the ranger station of owe one live five room modern residence one office and storeroom building and a tour four horse barn are about eighty per cent completed at the recreation park include one tour four unit chemical latrine two tour four unit pit type and two single unit pt type latrines 60 concrete camp stove hases bases with 15 stoves installed 75 camp ground tables automatic autom otic drinking fountains registration ciampi booth bulletin wards boards and daniu ground signs cleaning of SO 86 india individual camp sites and cutting still ami piling lill liiS of fire wood tor for use of caal ens all camp buildings which include kitchen and mess hall shower and wash room both installed with complete liot hot and cold water system amler house bouse recreation hall fori athletic with seating for 38 tent floors and frames shop carpenter shop ishop and storage faculties have all been constructed avid and in addition approximately Inia tely buoo cubie yards of gravel have been hauled a distance ot at two aud and one balt enill miles s for surfacing the camp streets and yards the beautification of the camp has been accomplished through tha initia initiative tite of 0 the men themselves and on their own wile time both officers and mm are arc desere ing of much praise for the work program put over ever and tor for the general attractiveness at 0 tile the camp |