Show MAUT MAIN TO BE CAPPED WITS WITH RED BED GRAVEL by way of further improving the condition ot of Pa rowana rowans main street through athe business section lt it Is to be capped with the crushed red gravel similar to what has hag been used on the highway As a part of the through highway the eighteen toot strip down the tenter center ot of the street has already been capped with this material but the strip on each side bide between the curb and the center Is ia now to td be capped also according tto a decision reached by the city council at its ita meeting on saturday night the estimated cost of this work which will extend only two blocks or from the east ward chapel corner down to the court house Is it will be done by the state road torce force which Is here at present with their crusher and trucks and can do it at less cost than it could be done at any time after they leave after computing tie 0 of the through highway tor for several ralles miles each side aide ot at here beri the force ot of state road workers capped the paro wan Y road from the corner 0 or of the barnes barncs farm arm into town and before leaving this locality they will del do our main street |