Show CONTRACTS LET FOR FOB LIGHT PLANT cot cost to be about which include new material and equipment quip ment throughout will be ready for operation a bout sept contracts were let by b the cit council on an alu dalt after about mt th alyee ee days das of 1 careful ful investigation ca for and ad emovi consideration lorm for practically all the equipment for the new four hun bun dred forty horse poser light and power poser plant to be built in our canyon canyo n as rapidly adly as possible the general electric company were the successful bidders for th the e elt electrical i machinery chinery n so pelton W waterwheel Water ate wheel co a ot or san sail franc sea represented by the P F C richmond machinery co aers ere awarded award ed the contract for the wa water te r wheel the wood pipe something more than sl six x thousand will ill be fo kunii ched cd by the american wood FP co 0 a the 1 steel I pipe pip is to ome me im from the sa salt it lake boiler and anc sheet iron NN Is co building of the power house excavating zw h cava ting some ha haunne tiong etc which we are induced in what is known as schedule tile avas as not at lt slid and are being re advertised they involve an est estimated I 1 mated expenditure ol 01 but wit p probably m stably come a little under those these figures the power poser house is at to be located at bar li locally known as ae the second it mill site and plans call for a frame structure as being more mom satis factory than black th the wood ad pipe is to be shipped be here in tae stave far form and put together and banded on the aroun i I 1 I 1 lie oceel tee pipe also will le riveted together after it gets here the advantage hen being I 1 g in the shipping just how won soon the work burk will earn corn mence is not to 15 known but live five months is given give for doli delivery verv of the writer water wheel which will beabout be about the last thing to be installed pres ent indications are am that september will 11 see the new light plant in operation n A rather substantial lanng ang in the cost could have been effe effected eted bi b purchasing the used it plant from barham city and ad im fo a time it rp ap heared as though a majority of the council favored that punt plant but when it came me time for final decision deci hion a motion dul seconded ded that it be pur por chased w by one to buy bay new equipment quip ment throughout |