Show Transfer TI Facility Completed Construction of a missile transfer facility has been completed completed completed com com- at the Hill range propellant propellant propellant pro- pro test area some 50 air miles west of Hill CONSTRUCTED by Jerico Construction Co of Murray the building cost Design surveillance and acceptance acceptance acceptance ac ac- tasks were provided by the Civil Engineering Division Division Division Di Di- vision at Hill AI ABB B The facility will permit transferring missile motors from one missile to another I within the environmentally I controlled building Previously Previously Previously Pre Pre- J this had to be done at Hill AN ton 75 lifting crane will be installed by June to give the facility i greater flexibility I The foot 53 high building makes an imposing sight on on the flat desert land Unusual Unusual Unusual Un Un- usual guillotine type doors are another feature of the complex MAIN DESIGNER on the project was Farrell R. R Winter Winter Winter Win Win- ter of Civil Engineering 00 |