Show state and out of state mining news the salt lake telegram says A E kipps lessee of the utah metal and tunnel company mine at bingham bangham Is installing trolley wire in the mines no 1 tunnel preparatory to substituting electric haulage for horses A fourton four ton electric locomotive will be installed as soon as the wire Is up the change is part of mr kipps program for increasing production from tons a week to 1000 at present lie he Is shipping ore only irom from the toot foot and foot levels above the tunnel As soon as the electric locomotive Is installed h be ae will begin shipping ore from deposits at the loot foot of 0 a foot shaft which he sank last year irom from the tunnel level at t ane ne same time he plans r lins to increase his force ores from 30 men to 50 the ores yield from 5 to sa 7 a ton in gold silver and copper with values principally in gold in salt lake last saturday night approximately persons persona attended the annual dinner and dance ot of the utah section american institute of mining and nd metallurgical engineers and auxiliary at the alta club gibson berry was chairman ol of arrangements assisted by carlos bardwell L S breckon paul H hunt R S lewis and tom lyon lor for the section and mrs E A hamilton chairman mrs A W rahn hahn mrs otto herres mrs B R A and mrs airs J V sadler lor for the auxiliary at goldfield nevada with the approach of good weather the re be organized silver king mining company with ground at the edge of Gold filed will push construction 1 st ot of its forty ton mill according to the announcement of william franks superintendent last week the plant Is partly finished but last weeks co cold I 1 d weather held zip up the concrete pouring it Is hoped that the mill will be in operation by march at the present time tests teats are being conducted to determine which type of flotation machinery will be best to use A placer machine capable of handling 1500 cubic yards a day will be put into operation on the clarks firx river in wyoming by the robert E cole gold company according to present company plans operations will be started may 1 work on the 2000 foot level ot of the niagara lagara mine at bingham ut utah s h has been started by the U S smelting smelling Sm elting refining mining company the holst hoist Is equipped tor for operations to do development work on the 2000 level the shaft will eventually be sunk to the foot level bingham utah mines shipped tons of ore during the week exclusive 0 of f the production of utah copper which Is shipping approximately tons of ore or dally daily bingham metals shipped 50 tons utah delaware united states smelting smelling Sm elting refining mining utah apex and utah metal tunnel BOO |