Show progress being made at park kadora progress of the park katora kalora mining company at park city adjoining the old valeo mine on the east side of the district has reached a point within striking distance in two places of the northeastern extension of the valeo fissure from which in the valeo mine was taken taken a considerable amount of copper silver ore in the ontario quartzite driving of the tunnel tannel started last summer carried the drift in to a point ISO feet from the portal where the first fissure three and one halt feet wide waa struck A at t feet another fissure was struck width of this vein according to manager charles M goddard had not been ascertained since it had just been struck in III the vein matter exposed there was six inches of tale talc and decomposed limestone carrying low grade values in silver and lead instead of crosscutting directly north to the valeo vein the company will drift northwest along no 2 vein to its intersection with the valeo fissure this will be done for two reasons progress along the no 3 2 vein should be much more mor rapid because of the softness of the ground secondly the chances chance of striking a body of ore are believed to bo be better at the intersection As progress Is made both to the north and west additional depth on the formation Is being gained the management la Is highly gratified both with the progress of the work and the strongly str ongy mineralized condition exposed |