Show reeds peak is expected to hit ore fissure soon at the reeds peak property development ve operations are being pushed with renewed energy since the compressor plant has been started up and the use of 0 a machine drill to drive ahead in the tunnel was made possible two shifts will bo be worked steadily in the face of the tunnel and it is expected that each should average between tour four and five feet a day says tile the utah mining news at this rate of 0 progress the thorough exploration ot of the company holdings ought to be rapidly accomplished the tunnel is headed tor for the intersection of the birthday no I 1 fissure with the main north south fissure and according to the calculation ot of the management it should be reached with a few shifts work in and near the intersection Is where a big ore body la is expected to be found as all geological indications are favorable tor for the occurrence of 0 such deposits mining men experienced in the cot ton wooda woods have pronounced reeds peak one of the best prospects in the big cottonwood district and some have gone so far as to assert the belief that the chances are good tor for the discovery of 0 ore bodies equal in every way to the cardiff bonanza while developments progress in the past has been slow because the work was being I 1 I 1 done by hand since the machine I 1 drills have been installed results of a pleasing kind are expected very soon |