Show CAPACITY OP SMELTER WILL BE GREATER THAN AT FIRST PLANNED prospects of ore consignments Consign ments have caused a change to be made engineer alma chambers of the utah smelling smelting Sm elting company has returned from a trip to the mines of southern and eastern utah he visited every mine of note and sent into manager kadash ot tho smelter re on the big producers that have made utah famous as a mineral state mr chambers states that conditions in park city and in the smelter district south of salt lake are excellent much ore iff being hoisted and the output of the mines exceeds the ca of reducing plants it Is expected that ores even from the extreme southern part ot the state will be shipped to the plant of the utah company for reduction as soon as it Is ready for operations many new properties are being opened thai will pour their contents into the mar ket and the local company is in a position to successfully handle their ores park city will be a contributor to the local plant freight rates from ogden to the mining town are low enough to make ore shipments profitable iti is in nevada however that the company looks for its richest fielce mr chambers will reconnoiter recon over the new fields af pf that state he leaves this week and expects to make a thorough examination of the camps directly tributary to ogdan the company has already a number of contracts for ore within the borders of ane state I 1 so encouraging is the outlook that the capacity of the smelter will be in mediately increased the initial capacity of the plant was planned at tons of ore per day work of en barging the smelter will not delay the completion of the sampler but will be brought about after operations are commenced and in time to handle contemplated increase of business the power line from brigham cit s approaching completion it is expected that sampling of ores will commence before tho middle ot th month |