Show ARCHITECT WHITAKER TO REMODEL CHOIR STAND kimball company will tear out the front of the tabernacle aclo building morning whit abor will commence io remodel the tabernacle choir and the basement below for the reception of the new organ until the organ is placed in position the tabernacle will not be used for any purpose radical changes will be made in the general arrangement at the stand the size of the organ will limit the present space to diminutive aft portions and in order to provide for the seating of the present choir more s space will be taken in front of th e operators board during the installation of the organ the entire front of the building will be torn out the kemball company desire thirty days in which to set up the big instrument an expert will arrive some time i in august and by the first of september the organ will be ready for dedication elaborate dedicatory services will be arranged and the occasion wilt be memorable in the history of church music in weber stake doans cure constipation without griping nausea nor any weakening effect ask your druggist for them 26 cents per box |