Show new now telephone line all the poles for the new telephone line between lere and farm ington have been set and the stringing of the number ten teu guage copper wire wire will be proceeded with to day after being completed to the above named point paint the copper wire will be spliced loathe iron wire wire to salt lake city but the liae lide will be copper clear through at ad early date Harry Cox will tend the reel and make the J bellamy superintending the whole awards job b with W cocking and J W ft edwards as climbers abolt three niile miles is an average day dyo et ringing gitig as he be line ru runs no regard leee ezeo roada through fielde fields etca necessitating much carrying by hand from the supply wagon |