Show SHORT LINE DOUBLE TRACK PROGRESSING Rapid progress Is now being made with the work of double-tracking the Oregon Short Line railroad between Ogden and Salt Lake. The necessary grading has been completed about one-half one-half of the way and rails are being laid between Salt Lake City and Wood6 Cross. Ties are being hauled to the various points on the road dally and they are being placed in position lor the laying of the rails between Woods Cross and Farmlngton. The new track has been ballasted but a short distance as yet. the wurk only having been begun about seven weeks ago. Considerable delay also has been occasioned occa-sioned by the filing of an injunction by the Denver & Rio Grande a little over a week ago. The Rio Grande alleges al-leges that the Short Line Is trespassing trespass-ing on Us right-of-way. |