OCR Text |
Show I BRIDGES FOR THE CANYON. With the awarding of the contract to a local contracting firm, work will start without further delay on the concrete con-crete bridge to bo erected at the mouth of Ogden canyon, to displace the steel structure which has been declared de-clared too weak to carry the traffic. The contract calls for the completion comple-tion of tho structure in 100 days, or close to the end of the year. With the building of a new bridge near the Hermitage and the erecting of the concrete arch at the entrance to the gorge, Ogden canyon will be a driveway most attractive and enduring. endur-ing. The road has cost $40,000 a mile, ithout the bridges and is pointed to as the best mountain highway in the United States. sa |