OCR Text |
Show MAY HAVE TO BUILD ROAD OVER LAKE I E. E. Kidder, senior highway engineer engin-eer of th United Btfttes bureau of public roads, returned today from an; 'inspection of the North and 3outh i highway between Coeur d'Alene and 'Sandpolnt. Idaho. He looked over j j several routes for this highway. The proposed route Is 4 6 mllc3 long, 1 ' Engini er Kidder's mission being to Behcet Be-hcet the best route involving the least number of railroad crossings and, bridges. One of the big problems will be the proposed construction of a two-mile bridge of the Pen d' Oreille Lake on the north and south highway. The big problem at this time Is whether to continue the proposed location lo-cation or to establish a more favoruble crossing, according to Engineer Kid- j der . If it is decided to construct the pro-: pro-: posed tWO -mile bridge, this structure i will be one of the longest In this section sec-tion of the country ever attempted for j I road purposes. |