OCR Text |
Show HEALY HOTEL REMODELING WELL ALONG Lathers and plasterers are making good headway on the Heal hotel and it will not be long until carpenters an! painters login operations. The walls and root of the annex havi been completed and workmen are now engaged ou the interior ol the structure Most of the plumbing in the lower part of the building hat tx-en finished and pipe fitters are engaged en-gaged on the upper floors The floor in the office and lobby Is ready foi tiling The walls of the rear end of the Elite cafe building have been razed to the ground and within a few davs excavation work will begin The excavation ex-cavation done the brick work will proceed with haste Although excavators have encountered encoun-tered much frost In the ground where the H. I White business block is being erected, progress has been nif.de and the men have a kOoi! sized hole starte i Men and learns are at work and it is expected by the contractor con-tractor tbat more rapid progress will be made hereafter as the ground is rapidly thawing. |