Show 1 DOUBLE TRACK WILL BE IN OPERATION TUESDAY superintendent whitney Is anchored at his desk again going through accumulated business after an inspection trip with chief engineer bunc ley of the anion pacific system over the now second track between grait gor and green grcen river the superintendent ten says the new double io track extension between these two points is 13 practically completed with the exception of three miles and will be in successful operation after next tuesday the gap of three miles will not be finished until warm warin weather admits of a resumption of construction work lie he adds that extremely cold weather has been experienced in western nebraska and wyoming luring during the last two weeks and climatic condition in those states has been radically different from the delightful winter weather n engaged by utah people |