Show CANYON ROAD WILL BE GREAT ENGINEER JOSEPH A WEST IS MAKING RAPID PROGRESS Line Will Be Opened to Travel Within a Short Time Excellent Work During Stormy Weather The electric line now non building through Ogdon Ogden canyon canon under un er the su sit supervision of oC Joseph Jo eph A West rest Is 19 pro progressing progressing gressing grossing at a more rapid pace paco than might bo be supposed considering the weather conditions of the time past winter The Th grade Is almost completed to toL Lewiss L camp hut bitt at that point progress ress Is Js obstructed obstruct d by b tho the heavy land landslide landslide slide of oC some seine days ago The Tho concrete for the two bridges es at the Ule mouth of the can cin canyon yon are monuments to tho the skill of workmen as the th foundations were laid during freezing weather and under the unfavorable conditions of storm and a swollen river sacks s of sand bo ho boIng booIng hoIng Ing used In forming coffer damns damn while the tho th cement work was being placed in inthe Inthe the time bottom of tho th stream tream Eight Bight cars of cement were ero usel In the construe construction tion Uon West Vest and Bateman Bros are arc the contractors doing doluS tho heaviest rock work and tt t ey r have made milde an ex ox excellent showing blasting off protruding ing mountain sides sll antI and moving great bodies of grade material AL At places the laborers are nrc suspended from fr m mighty cliffs jarring loose overhang overhanging ing rocks or placing blasts which are arc areto areto to tear out great ors The Time line lino from the tho mouth of o the time c Coln n nyon yon ron to The Hermitage measures 36 miles and the tho heaviest grade is less Jess than 1 per cent over a short stretch just juet Inside the tho portal of the canyon can on The grade Is less legs than 3 per por percent cent t The Tho road would have been opened for fOl travel to The Hermitage by 13 h May In 1 had hall the time slide at Lewiss camp not covered the limit hut even cven as asIt asit It Is the rails will be laid to Billy Wil Wilsons sons resort before the time end of oC spring springTime Time The bridges arc are to be bo In place by h April 20 One ot of the time deepest cuts will be bo at atthe atthe the time first curve CUlO after leaving the pres present enl emit terminus from rom tho the Sani but bill It will not be he excavated un mm lint III ill t II after aner the tho line Is i opened rails being laid temporarily on the curve border bordering lug ing on omm the county road Later on the time big hi lank bank at that point will give glo way before a steam shovel shoel which will scoop I Its Us way through time tho th center r of It milk mak making milkIng ing an from If Hi feet fet to lo IS feet cel deep leop to a L point Joint Just jUg west of or the first bridge across the river The railway company compan has lits agreed a reed to tomake tomake tomake make a nov new ne wagon road load at Lewiss camp C and amI at The rhe Hermitage Billy lII Wil Vil Wilson Vilson son has imas lIen been Instructed to change his wagon road so gO that an easier grade will be obtained the time survey bringing the crossing cros ing which will bi be at right angles to the time railroad some distance to 0 the west of or the timo beginning of or tho the present steep steel climb to the time hotel 6 In Tn operation ope atlon the road rood will wilt he be a scenic wonder and one of the time greatest attractions of this section When the time ilver Is in flood tho th sightseers on their entrance through the gateway of the canyon will wilt be bo greeted bj b a roar roam of the time river as It dashes ashes o over or great bould boulders ers In the bed of the stream tream foaming and like e a mountain torrent and ahead will ill stand s In grandeur perpendicular walls wails towering I 2000 feet above the time rails |