Show PROGRESS IN PAVING REMOVAL Removal 0 of the e old paving surface r isto orl r on the west side I of Washington to eve ave avenue evenue nue between Twenty fourth and Twenty-fifth Twenty streets was practically completed today and preparations made for laying of tho the new bituminous ous Otis surface The old surface on the west side ol ot the street between bet Twenty second and Twenty third streets was torn tom out during the latter lall r part of ot last lut week eek Weather conditions are satisfactory and It Is believed belle that the west side can be completely resurfaced within a week |