Show BLACK TOP CREWS NEAR STREET Crews laying laIng the bituminous surfacing ing log on ore the west side of or Washington avenue were nearing fifth Twenty street today and the street Intersection Intersection intersection tion was being prepared for paving Friday FrIda The surfacing will then con con- continue continue continue to Twenty sixth street and will probably be completed during the coming week I Work will bo begun on the east side of the street as soon as the concrete between and alongside the street car I tracks Is cured |