Show WILL ELIMINATE GRADE CROSSINGS SALT LAKE Aug 28 When When the federal highway is 15 built from Spanish Fork to the Colorado line lino beyond We In Grand coun coun- county county county ty according to the location now surveyed there will not nol be Le a 0 grade railroad crossing throughout The 4 road parallels the Denver lao llo Grande Western estern all the way some some- sometimes sometimes times quite closely c for tor long dis dis- distances dis- dis distances and several veral times through narrow canyons The present route Is ts about miles from where the tho road load leaves the pavement from Salt Sail Lake at Spanish I Fork ork At present Ire nt there are about 25 26 grade crossings croll on the route |