Show vv WORK ON ECHO RESERVOIR In A statement given Biven out In 1 Washington W Wednesday Elwood Bit Mead Mad Iad reclamation commissioner declared the In V papers in the Ech Echi J reservoir contract as prepared and i 1 by the th Weber River Water In Users association arc are toy form orm and he be looks books for early signing of o the contract by the th secretary o of the Interior has been m made mad de that the thi gov government proceed at an early carli date to authorize calling for tor or bids It was the when whet the movement mo was first started sti rte i that when lOper cent of oC the total water storage in the th reservoir reser was subscribed for Cor In regular form the government gO would authorize construction of ot the dam It no now looks as though all the tin stock in the th reservoir will be b subscribed and so there ther should beno beno be beno no further delay deity in gettIng under underway way The reclamation department has haa stated slated th that the reservoir should be b constructed within five years That must be the th extreme I length of time required as smaller small small- er cr reservoirs In the west have been built In two years It J the contract Is let without delay it w would be possible to store stor some waler water for or the th crops of o 1921 1928 |